Standard Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this energy unit is created for that operation of two independent circuits. Which are respectively for the main and subordinate platforms of the double scissors lift. Two cut-off valves are utilized for decreasing the machine manually in situation of electrical power reduction. If additional independent circuits are expected for your application please contact us for availability.
Remark: 1. Please consult our product sales engineer for that diverse pump displacement, motor energy or tank capability.
2. CSA or UL certified motors can be found upon request.
Particular Notes
one. The AC motor is of S3 duty cycle, which could only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean every one of the hydraulic components concerned ahead of set up of the power unit.
three. Viscosity of the oil shoud be 15~46 cst,as well as oil should really be clean and free of charge of impurities,N46 hydraulic oil is proposed.
4. The power unit must be mounted vertically.
5. Check the oil degree within the tank immediately after the first operating with the power unit.
6. Oil shifting is required soon after the initial 100 operation hrs,afterwards after each 3000 hrs.