EPG has established up a complete established of top quality administration program which is supplied with superior inspection and check gear. In 2000, EPG took the lead in getting ISO14001 surroundings administration certification and thereafter handed the inspection of cleanse generation and recycling economic climate, profitable the title of “Zhejiang Environmentally friendly Business”. We have exported our products to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the United states, Canada, and so on. Solution introduction
Stainless Steel SAE O-Ring EPT Adapters Hydrualic StraigEPTT SAE EPT Adapter
EPTnical Support
QC EPTs engineering has the capability to design and style drawings conform to SAE, BS, JIS, DIN amp ISO specs. And we can also make in accordance to customers’ drawings or samples.
Associated EPT
EPT Take a look at Certificate(EN15714/3.1)
We can offer the MTR for each shipment.
Manufacturing Approach
Package and EPT
Our Certification
QC EPTs has been granted ISO 9001:2015 amp SGS certificates for processing stainless metal EPT hose fittings and adapters.
Why Choose Us?
one. Heritage:
QC EPTs is an ISO 9001:2015 accredited company with in excess of 20 year’s production knowledge, EPTTizing in EPT hose fittings and adapters. We only target stainless steel material, no carbon steel or brass.
2. Solution selection, dependable top quality:
one. EPT EPT JCEPs
1). forty three Sequence CrEPTT EPT JCEPs/Couplings
two). HY Collection CrEPTT EPT JCEPs/Couplings
three). BW Series CrEPTT EPT JCEPs/Couplings
four). Stainless Metal EPT Ferrule For SAE 100R 1AT, 2AT EPT
5). Stainless Steel Woman JIC 74 Diploma Flare EPT JCEP
six). Stainless Metal Feminine BSP 60 Degree Cone EPT JCEP
7). Stainless Steel BSP EPT 60 Degree Cone Seat EPT JCEP
8). Stainless Metal Woman BSP sixty Diploma Cone 90 Elbow EPT JCEP
9). Stainless Steel NPT EPT EPT JCEP
2. EPT Adaptors
1). NPT EPT Thread Adapters
two). O-ring Boss SAE/ORB Adapters
3). JIC 37 Diploma Flare Adapters
4). NPEPT EPT Thread (feminine swivel) Adapters
5). O-ring Face Seal (ORFS) Adapters
six). BSPP/BSPT Adapters
3. Stainless DIN Metric EPT JCEPs
four. Stainless reusable hose fittings
five. Reduced pressure stainless metal thrust on hose finishes and hose barbs
three. EPTT EPTT Of Raw EPT:
one. We only select the greatest top quality stainless steel uncooked content. And metal suppliers supply content check certificates for each and every shipment.
two. We a hundred% evaluate the dimensions of bar stock and forging blanks by callipers for every single shipment.
three. We use the Moveable XRF Analyser to examination the important chemical factors of bar stock and forging blanks with 10% for each and every shipment(Essential chemical factors incEPTT Cr, Ni, Mo, these chemical components are extremely EPTTant for the corrosion functionality)
four. Aside from, we randomly select up a number of of chopping pieces to do more chemical investigation by spectrograph each ten daEPTTto make confident the uncooked materials 100% experienced.
four. EPTT EPTT Of Creation Method:
1. We are employing Sigma EPT-EPT CNC Lathe EPTTs to manufacture stainless steel hose fittings and adapters.
The functions of CNC Lathe EPTTs:
1). Twin-aXiHu (West EPT) Dis.s, EPT technique
2). Thread reducing resources: EPT Japan, vargus amp carmex Israel(Have a quite steady performance throughout machining)
2. We use callipers to measure the fundamental measurements. And we use the thread gages to examine the threads.
three. We use Contracer amp Contour Measuring EPTTs to inspect the extremely tiny angles and diameters.
five. Inspection:
one. First Article Inspection During Approach
1).The operator make the initial post in accordance to producing drawings.
two). The operator will inspect the very first post and document. If the measurements and threads satisfy the manufacturing drawings, and then the 1st article will be put in a EPTT box( the box is for very first article only).
3). Workshop foreman will consider second inspection for the very first report.
four). Only passing the inspection by workshop foreman, and then commence with mass production.
2. Mass Production After First Post Inspection
1).Following the first write-up authorized by operator and workshop foreman, and then start off with mass generation.
two). For the duration of mass production, the operator demands to examine the threads every single ten items, and measure the sizes every single 15 items. As soon as any fittings of threads and dimensions out of the specs, all this batch of fittings will be inspected fully.
three). The experienced fittings will be fitly set in a plastic box piece by piece.
four). Last but not least, the finished fittings will be transported to inspection department for last inspection.
3. Closing Inspection
1). Visual appeal: one hundred% inspection unEPTTstrong light. No scratch, No burr.
two). Important dimensions and angles: 15-twenty% randomly inspection by callipers and contracer. After any sizes and angles of fittings out of specs or does not respect to drawings, this batch of fittings will be pressured to return back again to manufacturing workshop to improve or make a new alternative.
three).Threads: fifteen-20% randomly inspection by rigEPTT gages. When any threads out of specs or isn’t going to respect to drawings, this batch of fittings will be forced to return back again to generation workshop to enhance or make a new alternative.
6. After Service:
When clients have any complaints about our goods, we will just take a quick action.
We can 100% make a new substitute for free of charge when the customer has a grievance about our products.
Our EPTT
FAQ
Q: Are you a buying and selling firm or maker?
A: We are a 100% manufacturer, main items include stainless metal EPT hose fittings and stainless metal EPT adapters.
Q: Do you have inventory?
A: At present we manufactured to get, but we do have some shares for common sort uncooked components. So we can make a fast motion for some urgent orders.
Q: Do you have a MOQ ask for?
A: Normally our MOQ is 200 parts. But for some larger measurements, fifty or 100 pieces is also satisfactory for the 1st buy.
Q: How about your payment approach?
A: 30% deposit in EPT, the balance payment against the copy of Monthly bill of lading. Of system, I think every little thing is negotiable.
Q: What about your delivery time?
A: About 45 daEPTTfor typical orders. But it depends on the orEPTTvolume. Of program, if you have an urgent get, we will try out greatest to fulfill you.