We – EPG Group the bigge EPT Chain and agricultural gearbox manufacturing unit in China with 5 different branches. For much more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Yuchen electrical power tramsmission offer you all the sprocket
Solution Description
one. American Common, European Regular, Japanese Standard
two. Pilot bore, concluded bore, taper bore and special bore obtainable
three. EPT surface area and substantial precision
4. Advanced warmth treatment and floor treatment method crafts
five. Greater good quality and competitive cost.
six. Content C45(1045), minimal carbon steel, 40Cr, 20CrMnTi, stainless metal these kinds of as SS316L, SS316, SS304, SS420, copper and so forth. available
7. Normal sea deserving package to Europe and American
8. High speed digital gear hobbing equipment to assure the teeths top quality
nine. Corrosion resistance treatment accessible
10. Handle on tolerance and simple to install
eleven. Excellent materials and great remedy to make confident lengthy daily life span
twelve. EPT welcome
Merchandise show
Manufacture approach
Organization kind | Maker & Exporter |
Primary export marketplace | Europe, North and South The usa, Southea EPT Asia, Oceania, Middle East, Africa |
Content | C45, low carbon metal, 40Cr, ca EPT iron, stainless metal, copper and many others |
EPT approach | Cast and then machined, hobbed, if need can also weld |
Heat treatment | High frequency quenching and so on |
Area treatment method | Oxide black, Galvanized, Nickel plated, Chrome plated, Sandblasting, Painted and so on |
Design | Type A & Variety B, Solitary, Double, Triple – 35B10-80,40B9-90,50B9-ninety,60B9-90,80B9-90,100B9-ninety,120B9-eighty,140B10-60,160B10-6006B10-one hundred twenty five,08B9-one hundred twenty five,10B9-one hundred twenty five,12B9-125,16B9-a hundred twenty five,20B9-114,24B9-90,28B9-seventy six,32B9-76, and EPT sprocket to suit with conveyor chain, transmission chain |
Packing | Plywood Situation/Pallet |
FAQ
Qone. What is your phrases of packing?
A: Usually, we pack our goods in one shade box. If you have special reque EPT about packing, p EPT negotiate with us in progress, we can pack the products as your request.
Q2. What is your phrases of payment?
A: T/T 30% as deposit, and 70% just before shipping and delivery. We are going to present you the photos of the goods and packages
prior to you pay the equilibrium. EPT payments terms, p EPT negotiate with us in advance, we can examine.
Q3. What is your terms of shipping and delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your supply time?
A: Normally, it will take twenty five to 30 times right after getting your advance payment. The particular delivery time depends
on the products and the amount of your get.
Q5. Can you make according to the samples?
A: Of course, we can create by your samples or complex drawings. We can construct the molds and fixtures.
Q6. What is your sample plan?
A: We can provide the sample if we have prepared components in inventory, but the consumers have to spend the sample co EPT and
the courier value.We welcome sample order.
Q7. Do you te EPT all your products prior to supply?
A: Of course, we have a hundred% te EPT ahead of supply
Q8: How do you make our enterprise prolonged-term and great romantic relationship?
1. We keep great good quality and competitive value to make certain our buyers reward
2. We regard every buyer as our pal and we sincerely do organization and make friends with them,
no matter where they appear from.
The use of first gear manufacturer’s (OEM) element figures or emblems , e.g. CASE® and John Deere® are for reference purposes only and for indicating product use and compatibility. Our company and the outlined replacement elements contained herein are not sponsored, approved, or made by the OEM.